How long will it take to get steel framing materials for my project?

There are many factors that contribute to the length of time required for steel framing materials to be delivered to the construction site. An average 2,800 square feet home can generally be fabricated in around eight hours. However, design, demand, and delivery time are also major factors to consider. As a rule of thumb, we usually ask that orders be placed 4 weeks prior to the date the materials need to be on-site, however, please give us a call to see if we are able to expedite your order.

Can SFT LLC frame my building as well?
Steel Frame and Truss LLC is in the business of manufacturing steel framing and Truss. We are not a framing labor company. However, we are working very closely with several subcontractor specialized in the steel framing.
How much will it cost to frame using steel?

Every project has its own requirements. We design our steel framing systems to these unique requirements rather than forcing our clients to work around our “standard sizes.” For an accurate estimate, please contact us and we will be more than happy to provide you with a free estimate.

What gauge steel do you use?

Different projects and framing members have their own requirements, and there is no one size fits all answer. As such, we manufacture steel ranging from 25 gauge to 16 gauge for residential, commercial, and light industrial applications. 

What file format should plans be submitted in?

For the fastest turn-around time we prefer that files are submitted to us are in either CAD or RVT format. However, we may be able to accommodate other file formats, please contact us if you have questions regarding other file formats.