BENEFITS OF LGS STRUCTURE

20% COST SAVING

Steel Frame Truss LLC  guarantees to match and beat wood framed cost in all of the 50 Sates. The taller the structure the bigger the saving. For mid to hi rise structures, the hard framing cost saving is between 20% to 50% versus wood and concrete.

Steel Frame Truss LLC structures are 20% or more lighter than wood structure, the saving starts from foundation.

Our LGS wall studs and floor joists are pre-punched for electrical, plumbing and HVAC ducts penetration, thus drop ceilings, soffits and all kinds of secondary framing are minimized, saving project time and cost, another 20% saving.

HSS hot rolled steel columns & beams are replaced by Our LGS built-up composite columns & beams, over 50% cost and time saving.

50% TIME SAVING

Versus wood framing, pre-panelized Steel Frame Truss LLC LGS framing accelerates schedule minimum by 50% if not 75%.

Versus cast-in-situ concrete, the Steel Frame Truss LLC LGS framing structure saves over 75% structure schedule.

All Steel Frame Truss LLC LGS framing panels are done parallel to site work, this leads to much faster project completion.

Since all pre fab work are off site, weather becomes an irrelevant factor for the project schedule.

LIFE TIME QUALITY

1000 years life according to one recent UK study of CFS structure if properly enclosed.

Green building structure with automatic 2 green building points from LEED certification.

No termite, no insects for life for your building structure.

All structural components are factory produced by automation with +/- 0.3mm precision.

100% NON-COMBUSTIBLE CONSTRUCTION

Conventional wood framed Type V low-rise residential construction can be replaced with 100% non-combustible Type II steel construction.

Conventional wood framed Type III or V mid-rise multifamily construction which requires 2 hours fire rating now can be replaced by 100% non-combustible Type II steel construction which requires only 1 hour fire rating on exterior bearing walls.

Conventional Type I concrete hi-rise structure can be replaced by Type II Our Steel construction which requires only 2 hours fire rating by code for exterior bearing walls up to 120’.

LOWER MEP/HVAC COST

All electrical service holes are pre-designed and punched to accommodate and speed up electrical wiring.

All plumbing horizontal and vertical penetrations in the structure are pre-designed and prepared ready for installation.

All HVAC ducts and pipes can be installed not only parallel but also perpendicular against the floor joists, thus eliminating drop ceilings and soffits, any kind of secondary structures, improving room ceiling heights and saving significant construction cost.

LOWER INSURANCE & MAINTENANCE

Construction insurance cost for Our framing is 1/5 of wood framing.

Building operations and maintenance cost for the structure part will be 1/10 versus wood framing.

Our LGS building will provide building owners with much higher property terminal value.

Tornado Hurricane Strong

Termite Proof

.

Moisture Mold Proof

Green Recyclable

If You Are A Building Designer, Architect, Builder, Or General Contractor Looking For More Information About LGS Framing Systems Or LGS Trusses, Contact Us Today Regarding Complementary Plan Review!